This project is going to be a standard screen room addition. We will be adding a new concrete slab poured around the existing slab, and cutting off the overhangs to achieve a taller roof line and add  more roof pitch. In this shot the slab has been completed, the overhangs are in removed, construction of the room is next.

High Plains Drive 32218 in progress 1

Now the walls, roof and Kickplate are installed.

High Plains Drive 32218 in progress 2

Next the screen is set, were done!

High Plains Drive 32218 after

High Plains Drive 32218 after Inside